FUT 0.00% 1.4¢ future corporation australia limited

re: Ann: San Jacinto 3D Project - Harrell No1... Hi all I said I...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 1,717 Posts.
    re: Ann: San Jacinto 3D Project - Harrell No1... Hi all I said I was not comming back til 0.005 oh well.

    Bottoms up: 1. a complete trip from the bottom of the wellbore to the top

    2. pertaining to the mud and cuttings that are calculated or measured to come from the bottom of the hole since the start of circulation. circulation may be initiated after a static period, such as a trip, or from a given depth while drilling. this latter type is particularly useful to mud loggers and others trying to discern the lithology being drilled, so mud loggers or mud engineers often retrieve what is referred to as a ?bottoms-up sample? of the cuttings or the drilling fluid.

    3. the sample obtained at the bottoms-up time or a volume of fluid to pump, as in ?pump bottoms-up before drilling ahead.?


    Do own research please
 
watchlist Created with Sketch. Add FUT (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.