This looks like an interesting departure from the drilling and testing plan
Going by the two updates, there are approximately 3 days of drilling time in which around 1500ft were drilled. That's about right for the planned 500ft/day on the schedule, but on the schedule 2 days are booked for MDT. To be where 88e is implies the MDT was not done.
MDT reveals plenty and a decision to proceed to target depth, and then complete all wireline says something about confidence. What I am not sure, but the optimist in me says good.
MDT link for a bit of background on what it is testing for, pretty old but useful
https://www.slb.com/~/media/Files/resources/oilfield_review/ors92/0492/p46_57.pdf
- Forums
- ASX - By Stock
- 88E
- Ann: RMP: Additional Interim Drilling Results
Ann: RMP: Additional Interim Drilling Results, page-21
-
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 88E (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $57.86M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $991 | 495.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
399 | 1062636226 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 69545220 | 20 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
392 | 1227558997 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 5375412 | 5 |
0.003 | 578667432 | 226 |
0.004 | 223019047 | 110 |
0.005 | 59085042 | 48 |
0.006 | 35128234 | 35 |
Last trade - 16.10pm 18/11/2024 (20 minute delay) ? |
Featured News
88E (ASX) Chart |