Davisite, do you have any insight as to how the Company would manage a small/contract production operation if they found good returns close to surface i.e, bring in a local operator in just to get the revenue ticking over to pay for the Engineering Plans to develop further. Always like the sound of that model as it validates the information/drilling and gets the regulatory stuff out of the way in a manageable way. Have not seen anything in the company literature, so wondering if you know the background of any of the Managers, are they production people or Geos wanting to fund an experiment
- Forums
- ASX - By Stock
- BC8
- Ann: Resumption of RC Drilling at the Bulong Gold Project
Ann: Resumption of RC Drilling at the Bulong Gold Project, page-16
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add BC8 (ASX) to my watchlist
(20min delay)
|
|||||
Last
73.0¢ |
Change
0.045(6.57%) |
Mkt cap ! $161.9M |
Open | High | Low | Value | Volume |
70.0¢ | 73.0¢ | 69.0¢ | $2.025M | 2.838M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 11737 | 73.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
73.5¢ | 46133 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 37469 | 0.385 |
1 | 14849 | 0.380 |
2 | 58500 | 0.375 |
3 | 107783 | 0.370 |
4 | 186557 | 0.365 |
Price($) | Vol. | No. |
---|---|---|
0.390 | 108730 | 2 |
0.395 | 178353 | 4 |
0.400 | 608864 | 10 |
0.410 | 210000 | 2 |
0.415 | 20000 | 1 |
Last trade - 11.39am 27/11/2024 (20 minute delay) ? |
BC8 (ASX) Chart |