The 60% refers to the St Georges Shear not the overall project. However, the point is still valid because very few hole results have been published. The point and it seems blindingly obvious to me is that you will only get all the results on the Resource Upgrade. That what counts not the odd hole here and there.Just need to wait.
- Forums
- ASX - By Stock
- Ann: Results of Meeting
The 60% refers to the St Georges Shear not the overall project....
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online