I agree. The plant is the key. They wouldn't be bothered with insignificant announcements if they didn't believe that potentially more was on the horizon. The plant needs to run at full capacity. Then we will all see a return on our investment, as debt will be reduced. Cash flow is key. Exploration success provides a longer term future. But for now we really need to see results in relation to the plant. Then the rest will follow. All In my opinion as a twit who stayed here too long due to a belief that minera was sitting on something big and had massive potential.
- Forums
- ASX - By Stock
- Ann: Results from technical visit to the Callejon copper mine
I agree. The plant is the key. They wouldn't be bothered with...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add TTM (ASX) to my watchlist
(20min delay)
|
|||||
Last
43.0¢ |
Change
-0.005(1.15%) |
Mkt cap ! $81.34M |
Open | High | Low | Value | Volume |
42.0¢ | 44.5¢ | 41.0¢ | $272.7K | 631.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 49999 | 43.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
44.0¢ | 20000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 3874 | 0.425 |
1 | 2150 | 0.410 |
1 | 62780 | 0.405 |
1 | 4999 | 0.400 |
1 | 10000 | 0.390 |
Price($) | Vol. | No. |
---|---|---|
0.440 | 44298 | 1 |
0.450 | 150126 | 6 |
0.460 | 10343 | 2 |
0.475 | 1920 | 1 |
0.480 | 18292 | 2 |
Last trade - 16.10pm 26/11/2024 (20 minute delay) ? |
TTM (ASX) Chart |