Ann from 26/10 announced drilling to start immediately...
Two rigs drilling 16 holes totaling 3,500m....
Drilling is testing KNOWN gold bearing mineralized faults (historic trenching & sampling returning high grade Au)...
It has been 11 weeks since the commencement of drilling. At a complete guess i would have thought 4-6 weeks required for drilling plus 4-6 weeks for assays. So guessing somewhere between 8-12 weeks in total. However im not sure how much time has been lost due to the xmas break. Either way results are due very soon.
GLAH + DYOR
- Forums
- ASX - By Stock
- Ann: Response to ASX Price and Volume Query
Ann from 26/10 announced drilling to start immediately... [IMG]...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)