Ann from 26/10 announced drilling to start immediately...
Two rigs drilling 16 holes totaling 3,500m....
Drilling is testing KNOWN gold bearing mineralized faults (historic trenching & sampling returning high grade Au)...
It has been 11 weeks since the commencement of drilling. At a complete guess i would have thought 4-6 weeks required for drilling plus 4-6 weeks for assays. So guessing somewhere between 8-12 weeks in total. However im not sure how much time has been lost due to the xmas break. Either way results are due very soon.
GLAH + DYOR