I think the response was saying that 1500 metres of the 2000 metres drilled ( over 10 or more drill holes I guess) has been assayed and TRL now await the last 500 metres assays. Bit confusing to say 1500 samples out of 2000 samples have been assayed. At least that's how I read it. But anyway, whatever, looking forward to the results