-
Share
9,666 Posts.
218
18/03/19
16:38
Share
LOM was 9.3 based on 155 K TPA I think
A new revised mining plan was released at the same time company advised that the offtake agreement had changed substantially.
As a result of a new mining plan, the company is forecasting annual average production of 240 K TPA over the next two years against its known reserve.
If you assume they continue at the new average rate the old LOM dropped in theory a far bit, hence the need for a drilling program
-