When CCZ have established the tonnes, grades and metallurgy of the stockpiles then Noble might have to do something but only if it can be shown that there is money to be made from the stockpiles.
gold - not worth a cracker - McDonough's Portal dump assays in parts per billion - release of 28-03-18
zinc - worth a po-ha - 0.2% Zn in stockpile = $6 / t but probably not worth a cracker in con - attracts a penalty in copper con
silver - worth a tom thumb or perhaps a po-ha - 6 g/t in stockpile = $4 / t, if con grade is greater than 30 g/t, then payment is for the balance.
NSR of ore approximately 50% of in-situ value less reclaim, rehab, admin, transport and treatment costs.
All IMO of course.
- Forums
- ASX - By Stock
- Ann: Request for Extension of Voluntary Suspension
When CCZ have established the tonnes, grades and metallurgy of...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CCZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
0.001(5.00%) |
Mkt cap ! $5.198M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 1.1¢ | $5.678K | 540K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 8668871 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 2908819 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1515889 | 0.004 |
18 | 13010685 | 0.003 |
12 | 9851913 | 0.002 |
12 | 13653004 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 1671109 | 4 |
0.006 | 3189249 | 5 |
0.007 | 537153 | 4 |
0.008 | 1425757 | 7 |
0.009 | 1597508 | 2 |
Last trade - 13.59pm 22/11/2024 (20 minute delay) ? |
CCZ (ASX) Chart |