NAE 12.5% 0.5¢ new age exploration limited

Nice! MINING AND PROCESSING STUDY CRL have engaged UK based...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 8,981 Posts.
    lightbulb Created with Sketch. 625
    Nice!

    MINING AND PROCESSING STUDY
    CRL have engaged UK based engineers Fairport Engineering, who have recent tungsten production plant experience, to carry out a scoping-level review of the Redmoor processing plant and surface infrastructure using existing metallurgical testwork and process flowsheet information. This is expected to be complete in April 2018 and will be used to provide scoping-level definition of capital and operating cost estimates for the processing plant and surface infrastructure required for the project.​
    CRL have also engaged technical consultants Mining One of Australia to carry out a scoping-level review of mine design, mining capital and operating cost estimate, based on the updated high grade resource estimate for the project. This is expected to be complete in April 2018 and will be used to provide scoping-level underground mining cost estimates for the project.
    Last edited by blister: 19/04/18
 
watchlist Created with Sketch. Add NAE (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.001(12.5%)
Mkt cap ! $7.175M
Open High Low Value Volume
0.5¢ 0.5¢ 0.5¢ $4.5K 1M

Buyers (Bids)

No. Vol. Price($)
34 18893837 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 12496705 7
View Market Depth
Last trade - 10.26am 22/11/2024 (20 minute delay) ?
NAE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.