For sure the redesign and resource drill results upgrade have enabled the to start the open pit, so the strip ratio has dropped, and the oz's per ton mined have gone up. End of Sept quarter results will be the true barometer of all costs. $850/950 per oz would be great, but wish full.
- Forums
- ASX - By Stock
- Ann: Quarterly Cashflow Report
For sure the redesign and resource drill results upgrade have...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ERL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.935M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 12064791 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 3463666 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 213962 | 0.009 |
2 | 205000 | 0.008 |
2 | 300000 | 0.007 |
2 | 242999 | 0.006 |
1 | 1000000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 873799 | 4 |
0.011 | 1121325 | 2 |
0.012 | 1374562 | 2 |
0.013 | 163000 | 1 |
0.015 | 40000 | 1 |
Last trade - 14.38pm 19/11/2024 (20 minute delay) ? |
ERL (ASX) Chart |
Day chart unavailable