Originally posted by Isladar
Excellent result overall and lots of Hiddenvalue.
Does anyone out there, have a good take on this, in the report.
I AM guess this report is lacking DETAIL.
Take Bartons, underground extension by 150 metres.This could be a game changer, I might have read it wrong?but if it is an extension to the current decline, it is a NST type intersection. Where an ore body goes sideways ( cheap access) not vertical (expensive access with a decline ratio of about 7 to 1 )
I am looking FOR the hidden value of Bartons 150 metre extension in their report. Where are the drill results, to support this .
If it is horizontal it could be a game changer.
Maybe I need to ask the company, to clarify. Or am I miss reading it.?