Share
134 Posts.
lightbulb Created with Sketch. 15
clock Created with Sketch.
01/11/18
14:52
Share
Originally posted by eshmun
↑
The 1-5-1 target is aspirational, the current mine plan if I recall correctly is more like in the 80-85koz range. I’m all for giving these stocks time but one thing I have learnt with gold mines is that the nature of the beast doesn’t normally change much no matter how much people are willing it to change. The gold and copper entered the ground here according to nature’s rules. If it doesn’t improve soon it will never improve. What was the time frame we were giving it last time we spoke? I can’t remember. One year from the CR maybe. Let’s see how it goes. Esh
Expand
yes. the copper is the issue. LJ needs to get the recovery up. pity the common use tailings dam isn't lined!. So, I'd be looking at a Xanthate unit on the front-end.
Last edited by
Lithos :
01/11/18