If you read the KLL technical report, on p26 they talk about trench modeling.
They estimate that a 3x3x1000m trench would have a refill of 7L/second.
That equates to 25 cubes per hour.
Compare that to actual pumping on LD of 159 cubes per hour per Km.
Furthermore, earlier in the report, when describing the surface alluvium, some of the terms are very similar to those used in describing LD. Alluvial deposits can and go contain clay.
They talk of two distinct aquifers in Beyondie separated by a clay layer whereas Ruane has said that the LD resource is open in all directions.
I'm not yet convinced that Beyondie is a better resource but it does appear to have better K concentrations than MacKay or SO4 and infrastructure looks good though they will still need to upgrade 78km of track.
Good luck.
- Forums
- ASX - By Stock
- Ann: Quarterly Activities Report
If you read the KLL technical report, on p26 they talk about...
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RWD (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.1¢ |
Change
0.001(1.43%) |
Mkt cap ! $9.114M |
Open | High | Low | Value | Volume |
7.1¢ | 7.1¢ | 7.1¢ | $1.065K | 15K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 225000 | 7.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.4¢ | 250000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 189708 | 0.100 |
1 | 10000 | 0.080 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 24000 | 1 |
0.110 | 8500 | 2 |
0.115 | 10000 | 1 |
0.120 | 32686 | 2 |
0.130 | 96000 | 3 |
Last trade - 14.08pm 02/12/2024 (20 minute delay) ? |
Featured News
RWD (ASX) Chart |