Disappointed to see a 4th consecutive increase in production costs, if the zinc price drops 15% KZL will have negative cash flow from their Mt Garnet Zinc Operation. Production costs for copper of 1.71/lb also place KZL in the upper end of the cost curve. It makes one wonder if KZL can make any money out of mining lower grade deposits such as Maitland or the CSE deposits.