Not necessarily, if you look at the plan in Fig 1, maybe the older holes (10 and 11 prefixes) have only tested the hanging wall vein, with the footwall vein only tested on the section MGV have done . Plus the footwall vein has possibly stronger grades. Don't need too many tonnes at >20g/t to make significant ounces!