There is no doubt that they can still do underground mining but it does have a potential impact as outlined in the 2017 annual report page 10:
Initial studies indicate the Pumped Hydro facility can be developed and operate concurrently with underground mining. However, the value of the underground mining would reduce due to ore left in the larger crown pillar required and increased mine development costs. Further studies will be carried out to optimise the combination of projects that returns the best value to shareholders.
- Forums
- ASX - By Stock
- Ann: Pumped Hydro Energy Storage Conference Presentation
There is no doubt that they can still do underground mining but...
-
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $108.9M |
Open | High | Low | Value | Volume |
5.5¢ | 5.5¢ | 5.4¢ | $75.96K | 1.393M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 1472431 | 5.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.6¢ | 793830 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 49767 | 0.080 |
2 | 230000 | 0.079 |
2 | 136415 | 0.078 |
1 | 97825 | 0.077 |
2 | 600000 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 137770 | 2 |
0.084 | 288879 | 3 |
0.085 | 2009000 | 2 |
0.089 | 229500 | 1 |
0.090 | 76002 | 3 |
Last trade - 14.00pm 29/11/2024 (20 minute delay) ? |
HGO (ASX) Chart |