Projections are for solar power in SA to reach a point in a couple years that electricity cost in the afternoons will be extremely low - some high quality modelling I have seen shows it as potentially negative (ie. having to shed power from the system because so much is being fed in by the sun).
This means pumping the water up the hill in the afternoon for little cost, and then running it back down into the pit when needed for healthy profit.
This project has serious legs.
Rosco
- Forums
- ASX - By Stock
- HGO
- Ann: Pumped Hydro Energy Storage Conference Presentation
Ann: Pumped Hydro Energy Storage Conference Presentation, page-12
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.8¢ |
Change
0.001(1.75%) |
Mkt cap ! $108.9M |
Open | High | Low | Value | Volume |
5.7¢ | 5.8¢ | 5.7¢ | $40.88K | 712.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 637837 | 5.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.8¢ | 431267 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 49767 | 0.080 |
2 | 230000 | 0.079 |
2 | 136415 | 0.078 |
1 | 97825 | 0.077 |
2 | 600000 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 137770 | 2 |
0.084 | 288879 | 3 |
0.085 | 2009000 | 2 |
0.089 | 229500 | 1 |
0.090 | 76002 | 3 |
Last trade - 15.34pm 22/11/2024 (20 minute delay) ? |
HGO (ASX) Chart |