PROJECT ENHANCEMENT RC DRILLING CONFIRMS HIGH GRADE CONTINUITY
HIGHLIGHTS
RC DRILLING SUCCESSFUL IN BOTH INFILLING AND EXTENDING DEFINED GABANINTHA MINERALISATION.
CENTRAL PIT RC RESULTS CONFIRM CONSISTENCY OF GRADE AND WIDTH OF HIGH GRADE MINERALISATION ALONG STRIKE AND DOWN DIP.
DEPTH EXTENSION INTERSECTIONS 25M TO 50M DOWN DIP OF CURRENT INDICATED RESOURCE. RESULTS INCLUDE:
▪ 14M AT 1.17% V2O5 FROM 208M AND ▪ 12M AT 1.17% V2O5 FROM 192M.
RESOURCE INFILL HOLES INDICATE SCOPE TO EXTEND CENTRAL PIT INDICATED RESOURCE STRIKE LENGTH BY +300M TO THE SOUTH. RESULTS INCLUDE:
▪ 16M AT 1.26% V2O5 FROM 28M AND ▪ 14M AT 1.14% V2O5 FROM 90M.
INFILL DRILLING AT THE SOUTHERN TENEMENT INTERSECTED HIGH GRADE MINERALISATION IN EACH HOLE WITH GRADES CONSISTENT WITH, OR EXCEEDING, THE RESOURCE GRADES.
TMT Price at posting:
53.0¢ Sentiment: Hold Disclosure: Held