Your negativity astounds me Erewhon. Drilling has commenced and you're still winging.
DVEous
Have a look at the planned drill spacings. A 80m x 400m grid is quite sufficient to establish an Inferred JORC (initial JORC). I would expect the next drill program to be 80m x 200m which will give us an Indicated JORC. The final drilling program will more than likely be a 40m x 100m spacings, in which case a Measured JORC should be achieved.
It's a process of stepping up the confidence levels.
As for the timing of the initial JORC, I would imagine that Gary is learning how to under promise and over deliver!!!
- Forums
- ASX - By Stock
- AGU
- Ann: Progress Report
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)