I have to agree with that interpretation - I think one of my earlier posts had the same conclusion as yourself as to the drilling already having commenced!
At least this gives us a absolutely solid time that it has actually commenced, looking at the bright side of things as much as I can
- Forums
- ASX - By Stock
- Ann: Progress Report - Takane Drill Program-BML.AX
I have to agree with that interpretation - I think one of my...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add SI6 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.737M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $4.114K | 4.113M |
SI6 (ASX) Chart |
Day chart unavailable