Management making good on what they said they would do in a cost effective and timely manner.
Not long until trial mining get underway, until then more drill results due from RoD one would think.
Some more 8.9m @ 11.47g/t Au from 0m intercepts would be great, which would show ore spanning hundreds of meters.