Adding to my anger is this little quote from the update. Come the 11th March we are told everything is on track and their are no material changes.
The production shortfall peaked in February and was addressed in March through a number of xactions which included the mobilisation to site by the underground mining contractor of two new 60t trucks and a new tele-remote loader.