PS: The 8500 ton stockpile of ore @ 13 g/t represents 3500 ozs AU. That only represents 110 ton a day for a plant capable of 400.
Suppose mining goes from zero today to 400 ton a day rate on the 30th Sept this would produce another 15400 ton and at 13 g/t this would produce an extra 6400 ozs Au
or 9900 ozs total for the quarter.
IMO, short of hitting the bonanza grades in this quarter, this should be the best case
scenario. We now need mining volumes and grade announcements on a regular basis
until production stabilises.
cheers
mm
- Forums
- ASX - By Stock
- Ann: Production Ramp-Up to Commence at Talang Santo
PS: The 8500 ton stockpile of ore @ 13 g/t represents 3500 ozs...
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add KRM (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.3¢ |
Change
-0.001(2.94%) |
Mkt cap ! $26.37M |
Open | High | Low | Value | Volume |
3.5¢ | 3.5¢ | 3.3¢ | $6.507K | 193.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 320000 | 3.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.3¢ | 151333 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 172188 | 0.050 |
2 | 577777 | 0.045 |
1 | 50000 | 0.044 |
1 | 100000 | 0.041 |
1 | 625000 | 0.040 |
Price($) | Vol. | No. |
---|---|---|
0.051 | 58535 | 1 |
0.052 | 55000 | 1 |
0.054 | 305000 | 2 |
0.055 | 220000 | 2 |
0.058 | 85800 | 1 |
Last trade - 16.10pm 22/11/2024 (20 minute delay) ? |
KRM (ASX) Chart |