Looks like everything's on track.
A doubling of previous campaign means 260 - 300 tonnes. So, ATC will make another $1-2m by the end of this year.
I think the smelter has a capacity of 400 t/mn. Which means a couple of more campaigns after this one, and ATC would be able to run the smelter at full capacity for a month.