That is in fact a higher grade than the stockpile is forecast to finish at when mining stops. The forecast number is .22%
VAA have done the hard work for you plough, read the valuation, all the numbers are there, .
The free cash flow looks like this.
VAA valuation $88.7m
Copper price adjustment circa $40m (MY assumption 40cents a lb )
Additional tax ($12m)
Total free cash $116.7m
Per share 20.47 cents
Franking credits 24+8+12= $44m
per share 7.7 cents
Which paves the way for
A fully franked dividend of 18 cents
Which requires $102m
and would leave only $14.7m for exploration and expansion.
If they need more than that I'm pretty sure the wisdom of paying fully franked dividends to drive up the share price and make a share placement very attractive won't be missed. We fortunately have the MD of Greshams holding a decent parcel of shares and sitting at the board table..
There is a huge margin for error with the share price at 8.5 cents
- Forums
- ASX - By Stock
- Ann: Primary Crusher Bearing Replacement
That is in fact a higher grade than the stockpile is forecast to...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
-0.001(1.79%) |
Mkt cap ! $108.9M |
Open | High | Low | Value | Volume |
5.5¢ | 5.6¢ | 5.5¢ | $58.83K | 1.068M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 260464 | 5.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.6¢ | 1299265 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 49767 | 0.080 |
2 | 230000 | 0.079 |
2 | 136415 | 0.078 |
1 | 97825 | 0.077 |
2 | 600000 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 137770 | 2 |
0.084 | 288879 | 3 |
0.085 | 2009000 | 2 |
0.089 | 229500 | 1 |
0.090 | 76002 | 3 |
Last trade - 15.57pm 26/11/2024 (20 minute delay) ? |
HGO (ASX) Chart |