probably irrational to put npvs on a study that wont go to fs/funding for minimum 2 years. rail studies are are all market driven price and cost assumptions - all you do putting out early npvs is give the eternally uncommitted a kick me sign. same as saying not to talk about a potential fastest route. potential is potential - it awaits confirmation
sequential reads as Erdenet-Ovoot mirroring Kuragino-Kyzyl line - then later ovoot-Arts Suuri mirroring Kyzyl-Arts Suuri. So an FS to bank with is going to have to incorporate possibly different input assumptions for everthing from steel costs to labour in 2+ yrs time.
thats the real world - to make big bread all you can do is thumbsuck, knead the dough, measure, knead the dough - till finally you can put it in the oven. Then you still have to see whether you;ve put it in at the right temp - for all that hard work before
- Forums
- ASX - By Stock
- Ann: Preliminary Economic Assessment Demonstrates Rail Viability
probably irrational to put npvs on a study that wont go to...
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AKM (ASX) to my watchlist
(20min delay)
|
|||||
Last
29.5¢ |
Change
-0.020(6.35%) |
Mkt cap ! $149.7M |
Open | High | Low | Value | Volume |
31.5¢ | 31.5¢ | 29.0¢ | $37.22K | 124.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 8612 | 29.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
31.0¢ | 10000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 36520 | 0.290 |
1 | 15000 | 0.280 |
1 | 100000 | 0.275 |
1 | 100000 | 0.270 |
1 | 18600 | 0.265 |
Price($) | Vol. | No. |
---|---|---|
0.305 | 26548 | 2 |
0.310 | 48000 | 1 |
0.315 | 22000 | 2 |
0.320 | 100000 | 1 |
0.325 | 59210 | 2 |
Last trade - 16.10pm 15/11/2024 (20 minute delay) ? |
AKM (ASX) Chart |