RWD maxed out trench length on its little lake and then was forced to back-solve for flow rates.
AMN instead went the other way conservative flow rates and then mapped out a required trench length.
Fortunately for you RWD's project doesn't justify investment (14% IRR) so grossly over-estimating flows won't be the roadblock - it will simply never be developed.
It would have been easy for AMN to underestimate trench length and overestimate flows as is the case at RWD, but I'm glad AMN has used realistic but justifiable assumptions.
- Forums
- ASX - By Stock
- AMN
- Ann: Pre-Feasibility Study Completed for Mackay SOP Project
Ann: Pre-Feasibility Study Completed for Mackay SOP Project, page-92
-
- There are more pages in this discussion • 73 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
0.010(7.41%) |
Mkt cap ! $60.70M |
Open | High | Low | Value | Volume |
13.5¢ | 14.5¢ | 13.5¢ | $4.941K | 35.18K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 30000 | 14.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 74741 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5555 | 0.180 |
1 | 30979 | 0.175 |
5 | 69411 | 0.170 |
2 | 106061 | 0.165 |
2 | 18611 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 10525 | 1 |
0.195 | 28699 | 1 |
0.200 | 10206 | 2 |
0.205 | 15888 | 2 |
0.210 | 8238 | 1 |
Last trade - 13.05pm 26/11/2024 (20 minute delay) ? |
AMN (ASX) Chart |