the AMN ponds appear to be "un-lined". the PFS says:
* "The evaporation ponds are planned to be located in the south-western area of Lake Mackay where geotechnical testing has determined that the natural salt lake surface is suitable for un-lined evaporation ponds." KLL estimates:
* Lined ponds may achieve a SOP recovery of up to 87% (excluding purification plant recovery loses)
* Unlined ponds may achieve a SOP recovery of up to 69% (@0.5mm/day leakage, excluding PPRL)RWD estimated around a 15% loss of recovery due to seepage from partially lined ponds:
* It is estimated that the will be a 15% loss of the potassium and magnesium values to seepage and entrainment in the halite ponds.AMN has Brine Field & Pond System CAPEX of $107M
RWD has Production - Trenches and Ponds CAPEX of $57M
AMN has Process Plant CAPEX of $108M plus Utilities, Reagents & Vehicles of $57M
RWD has Process Plant CAPEX of $73M with 65% process plant recovery
AMN's 426,000tpa is exactly 80.3% recovery from 66.3Mm3 at grade of 8.0kg/m3.
- Forums
- ASX - By Stock
- Ann: Pre-Feasibility Study Completed for Mackay SOP Project
the AMN ponds appear to be "un-lined". the PFS says: * "The...
-
- There are more pages in this discussion • 147 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $60.70M |
Open | High | Low | Value | Volume |
13.5¢ | 13.5¢ | 13.5¢ | $89 | 660 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 71467 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 10579 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5555 | 0.180 |
1 | 30979 | 0.175 |
5 | 69411 | 0.170 |
2 | 106061 | 0.165 |
2 | 18611 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 10525 | 1 |
0.195 | 28699 | 1 |
0.200 | 10206 | 2 |
0.205 | 15888 | 2 |
0.210 | 8238 | 1 |
Last trade - 09.59am 26/11/2024 (20 minute delay) ? |
AMN (ASX) Chart |