its written in the PFS:
The application of wet harvesting of the later stage waste salts and Potassium-bearing salts has delivered several key benefits to the Project, including:
• A lower overall operating cost per tonne of salt harvested that justifies the higher upfront capital;
• An increased overall recovery due to a portion of the Potassium-bearing brine entrained in waste salts in Ponds 2 and 3 being drained and pumped back into the pond system; and
• A decreased overall pond size due to Ponds 2, 3 and 4 not being taken off-line and dried prior to harvesting.
- Forums
- ASX - By Stock
- Ann: Pre-Feasibility Study Completed for Mackay SOP Project
its written in the PFS: The application of wet harvesting of the...
-
- There are more pages in this discussion • 149 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
0.010(7.41%) |
Mkt cap ! $60.70M |
Open | High | Low | Value | Volume |
13.5¢ | 14.5¢ | 13.5¢ | $4.941K | 35.18K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 30000 | 14.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 74741 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5555 | 0.180 |
1 | 30979 | 0.175 |
5 | 69411 | 0.170 |
2 | 106061 | 0.165 |
2 | 18611 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 10525 | 1 |
0.195 | 28699 | 1 |
0.200 | 10206 | 2 |
0.205 | 15888 | 2 |
0.210 | 8238 | 1 |
Last trade - 13.05pm 26/11/2024 (20 minute delay) ? |
AMN (ASX) Chart |