At the moment Agrmins 0-3m specific yield resource is circa 5Mt but their recovery from their insitu 20Mt is 10Mt ! no wonder the market doesn't know which is is up with these deposits...specific yield needs to be scraped by the ASX imo. It's misleading and basically not applicable to these deposits if they are yielding 2x the drainable figure.
- Forums
- ASX - By Stock
- AMN
- Ann: Pre-Feasibility Study Completed for Mackay SOP Project
Ann: Pre-Feasibility Study Completed for Mackay SOP Project, page-130
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.0¢ |
Change
-0.005(3.45%) |
Mkt cap ! $60.70M |
Open | High | Low | Value | Volume |
14.5¢ | 14.5¢ | 14.0¢ | $9.437K | 67.18K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 86515 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 13510 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5555 | 0.180 |
1 | 30979 | 0.175 |
5 | 69411 | 0.170 |
2 | 106061 | 0.165 |
2 | 18611 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 10525 | 1 |
0.195 | 28699 | 1 |
0.200 | 10206 | 2 |
0.205 | 15888 | 2 |
0.210 | 8238 | 1 |
Last trade - 12.49pm 22/11/2024 (20 minute delay) ? |
AMN (ASX) Chart |