There's gaping holes in the RWD numbers. The RWD flows cannot be seen as conservative. The risk is that if their trenches do not flow as expected they have nowhere left to go to get the additional required brine.
AMN on the other hand have used flows which are 1/4 of the RWD flows, but also have additional lake area for further trenching IF required.
- Forums
- ASX - By Stock
- AMN
- Ann: Pre-Feasibility Study Completed for Mackay SOP Project
Ann: Pre-Feasibility Study Completed for Mackay SOP Project, page-102
-
- There are more pages in this discussion • 63 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.0¢ |
Change
-0.005(3.45%) |
Mkt cap ! $60.70M |
Open | High | Low | Value | Volume |
14.5¢ | 14.5¢ | 14.0¢ | $9.437K | 67.18K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 86515 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 13510 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5555 | 0.180 |
1 | 30979 | 0.175 |
5 | 69411 | 0.170 |
2 | 106061 | 0.165 |
2 | 18611 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 10525 | 1 |
0.195 | 28699 | 1 |
0.200 | 10206 | 2 |
0.205 | 15888 | 2 |
0.210 | 8238 | 1 |
Last trade - 12.49pm 22/11/2024 (20 minute delay) ? |
Featured News
AMN (ASX) Chart |