I would think they would want to conduct the early trials in fairly calm conditions.
The first Ceto trials were conducted inside Cockburn Sound before they ventured outside.
Bombora conducted trials in the Swan River.
The swell forecast for Bunbury is for seas around 2 metres but that would be outside I am guessing.
http://swell.willyweather.com.au/wa/south-west/bunbury.html
- Forums
- ASX - By Stock
- Ann: Pre-deployment Preparation Completed, Deployment Imminent-POW.AX
I would think they would want to conduct the early trials in...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POW (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.204M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
POW (ASX) Chart |
Day chart unavailable