Great work for the team - these guys want to mine. I liked this quote.
In the interim, due to the successful delivery of many components faster than expected, Galena is proposing to release a Scoping Study in late June in advance of the PFS. The excellent metallurgical results have allowed finalisation of mine planning and scheduling to be advanced. As a result, Galena believes it will be in position to deliver the Scoping Study as an interim report to the market.
- Forums
- ASX - By Stock
- Ann: PFS metallurgical testwork advances base metals Abra deposit
Great work for the team - these guys want to mine. I liked this...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable