Good analysis, Ozwire.
The most outrageous thing is that it's taken Ramy 3 years to "commission" this meagre collection of equipment.
The (bashed up) veneering machine was already working previously at Walkamin, so was minimal commissioning should have been required for this, ... just connection to services and local adjustments. (Provided Ramy handled the decommissioning and transport correctly !!)
So, it's taken Ramy 3 years to commission 2 conveyors, a hydraulic press, a baling press, a table, and a motor bike,(!) all of which were simple purchases with 'plug and play' set ups.
Go figure.
- Forums
- ASX - By Stock
- Ann: Papyrus Egypt Business Project Update - 6 March 2018
Good analysis, Ozwire. The most outrageous thing is that it's...
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add PPY (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.941M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 60000 | 1.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.7¢ | 76923 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 480546 | 0.005 |
1 | 147800 | 0.004 |
1 | 250249 | 0.003 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 550422 | 2 |
0.009 | 275000 | 1 |
0.012 | 447314 | 2 |
0.014 | 62520 | 1 |
0.015 | 482463 | 1 |
Last trade - 16.12pm 29/11/2024 (20 minute delay) ? |
PPY (ASX) Chart |
Day chart unavailable