Question is not yet valid. They need to confirm if the inflow and pumping water data is good enough for a viable project. If the data is good then we should get an update on expected timeline for production. It will be at least 12 mths as the need to construct ponds and get pumps in place, then 4-6 months of evaporation time per pond I believe.
- Forums
- ASX - By Stock
- Ann: Options Underwriting Over Subscribed-GPH.AX
Question is not yet valid. They need to confirm if the inflow...
-
- There are more pages in this discussion • 54 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add APC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.070M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
APC (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online