Nowhere in your copious contributions is there any serious discussion about the economics of the project.
Rather than engage on this detail, you just throw hand grenades.
In other posts I and others have contributed analysis which included relevant costs and inputs, based on a comparable mine in the region (which has open cut, not room and pillar but has expensive depth mining and that was excluded).
Several times I have posted links to these discussions, and each time you and some other prolific posters others ignore them or mess up the analysis.
This is extremely tedious.
I will repost the links and get again attempt to restart some substantive discussion on economics of Oposura at some stage in the near future. I'm sure the Germans don't have such problems.
Meanwhile it's Friday. Enough.
AZS Price at posting:
22.5¢ Sentiment: Buy Disclosure: Held