Tlou Energy gearing up for October drilling
2018-09-17 07:51:00
The Lesedi project's first coalbed methane pilot production well is due to be drilled next month
http://www.*.co.uk/thumbs/upload/News/Image/2018_09/600z371_1537167283_oil-worker.jpg
The final pieces of equipment needed for the project are presently awaited
Tlou Energy Ltd (LON:TLOU) has updated on its operations at the Lesedi coalbed methane project, where it is gearing up for a well in October.
The company, in a statement, confirmed that the well locations have been agreed, scouted and inspected.
READ: Closing date extended for CBM power proposal
Site preparation is now underway for what will be the first pilot production well, and, it is presently awaiting the delivery of all equipment needed prior to spudding the well.
Tlou highlighted that the wells are planned to be drilled as ‘dual lateral pods’ comprising a vertical production well, intersected by two lateral wells (drilled through gassy coal seams) whereby the gas will be extracted via the vertical bore.
The gas would then be gathered for power generation purposes.
City broker eagerly awaiting well drill results
“If successful, the new wells will form part of Tlou’s initial gas-to-power project, which will include the installation of transmission lines and grid connection,” said Shore Capital analyst Craig Howie.
“With an initial (and very scalable) development of up to 10MW planned, we therefore eagerly look forward to results from the forthcoming drilling programme.”
“Our fair value estimate stands at approximately 25p/share and, with a formal government re-tender process currently underway (in relation to which we believe that the company is superbly positioned) and a very active work programme in progress at Lesedi, we continue to see excellent scope for Tlou to become a leading Southern African-focused independent power producer.”
Tlou shares were up 2.8% to 6.1p in late afternoon trading in London.
Cheers
Ft ft
- Forums
- ASX - By Stock
- Ann: Operations Update
Tlou Energy gearing up for October drilling 2018-09-17 07:51:00...
-
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add TOU (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $38.58M |
Open | High | Low | Value | Volume |
1.7¢ | 1.7¢ | 1.7¢ | $612 | 35.99K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1177477 | 1.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.8¢ | 238018 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 26833 | 0.030 |
4 | 579137 | 0.029 |
1 | 8753 | 0.028 |
1 | 20000 | 0.027 |
2 | 300000 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 703000 | 2 |
0.034 | 35000 | 1 |
0.035 | 35455 | 1 |
0.036 | 18322 | 1 |
0.037 | 50000 | 1 |
Last trade - 11.57am 22/11/2024 (20 minute delay) ? |
TOU (ASX) Chart |