Key Points:
• Tlou’s core drilling rig has arrived at the Company’s field camp in Botswana and when
commissioned, will be utilised to provide flexible and cost-effective coring operations;
• Ordering of long lead time items, purchase of drilling equipment and rig selection for
the gas production pods are progressing in a timely manner;
• A report detailing the optimum locations for the gas production pods is nearing
completion.
- Forums
- ASX - By Stock
- Ann: Operations Update
Key Points: • Tlou’s core drilling rig has arrived at the...
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add TOU (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $38.58M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 773699 | 1.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.8¢ | 1303305 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 26833 | 0.030 |
4 | 579137 | 0.029 |
1 | 8753 | 0.028 |
1 | 20000 | 0.027 |
2 | 300000 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 703000 | 2 |
0.034 | 35000 | 1 |
0.035 | 35455 | 1 |
0.036 | 18322 | 1 |
0.037 | 50000 | 1 |
Last trade - 07.00am 27/11/2024 (20 minute delay) ? |
TOU (ASX) Chart |
Day chart unavailable