Blina processed though the wet season but it slowed them down a bit. Ellendale worked throughout the wet. Can't see the wet stopping the plant being built and a good bit is going on behind the scenes aswell. If they don't do any major trial mining you'd bet it will be all ready to go full steam in march.
From Blina annual report
"Processing continued throughout the northern ‘wet season’(with lower throughput due to the sticky nature of the clay-rich ore)"