MAY 3.23% 3.0¢ melbana energy limited

This is the operational update for Sherritt's drilling in...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 141 Posts.
    lightbulb Created with Sketch. 21

    This is the operational update for Sherritt's drilling in CUBA, 



    As previously reported, Sherritt resumed drilling on Block 10 in early July. Drilling continues today. During the quarter,the expandable casing technology imported to address the loss circulation zones in the upper reservoir wassuccessfully deployed. Drilling continued to a total depth of approximately 5,000 meters of the planned 5,960 meters.Recently, wellbore instability has been encountered between the upper and lower reservoirs. To manage the wellboreinstability, a portion of the wellbore below the upper reservoir is currently being re-drilled and results are anticipatedwithin 90 days. Total capital spending for the oil division, including added costs for drilling on Block 10, are nowestimated at approximately US$29 million for 2018.

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
-0.001(3.23%)
Mkt cap ! $94.36M
Open High Low Value Volume
3.0¢ 3.0¢ 2.9¢ $98.24K 3.284M

Buyers (Bids)

No. Vol. Price($)
1 86990 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.1¢ 181225 2
View Market Depth
Last trade - 16.10pm 18/11/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.