I'll have a look over the weekend jumpstart. I can remember seeing either milling or mining costs per tonne at one point. I have a feeling that it was milling. The electricity contract has since been adjusted though, which would be a major cost input. Staffing costs had gone through the roof in the boom, which will be able to be controlled though contract.
Barnicoat from memory had issues with the crusher and the Laverton ore type. I'll have to re-read but I have a feeling that they would need to do some work to get it up and running.
SP projections really depend on throughput and grade, so going to hold fire until we get some more news. I'm expecting $3-500 margin per ounce at this point though
- Forums
- ASX - By Stock
- Ann: Operational Update
I'll have a look over the weekend jumpstart. I can remember...
-
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add FML (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.0¢ |
Change
0.010(6.25%) |
Mkt cap ! $40.11M |
Open | High | Low | Value | Volume |
17.0¢ | 17.0¢ | 17.0¢ | $340 | 2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 11550 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 38500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 13612 | 0.270 |
1 | 114320 | 0.260 |
2 | 34882 | 0.250 |
1 | 3401 | 0.240 |
2 | 4600 | 0.230 |
Price($) | Vol. | No. |
---|---|---|
0.275 | 32000 | 1 |
0.280 | 58522 | 2 |
0.290 | 28948 | 1 |
0.300 | 13679 | 3 |
0.310 | 3229 | 1 |
Last trade - 13.39pm 15/11/2024 (20 minute delay) ? |
FML (ASX) Chart |