4A took roughly 4 months from spud to production from memory, though the contractors did drop a tool down the well at one point, which delayed things for a week or 2.
So far this drill appears similar to 4A, so hopefully they can get better flows. Hopefully plenty was learnt re the first frack, as that appears the crucial element for this area.