So 100,000 pounds of frac sand pumped into the zones of interest up to a couple of hundred metres in length and however high and she doesn't flow.. but a few perforating intervals with pentration of a few inches into The formation is gonna turn it into a gusher. I would say this well is below expectations. You don't frac five stages for gas rates between 0.6 MMCFD and 0.8 MMCFD. Anyway all the mates loaded at 10c can't see them drilling for a while now
AJQ Price at posting:
11.5¢ Sentiment: Hold Disclosure: Not Held