Basically they've intersected a 4m column in the Hutton & 6m column in the Adori SST.
OIP is 20 + 59 MMBbls = 79 mmbbls
They couldn't recover any oil not that they were planning a DST as such.
U need to factor in a recovery factor of say 8-20% depending on the reservoir property to work out how much of that 79 mmbbls will b recovered & over what timeframe.
Weather's gonna b an issue now on as most operators will b getting their crew out of the Galilee, so they'll have to come back & test this sometime in 2012 & drill the larger prospect at KE#1
cheers
EXE Price at posting:
14.0¢ Sentiment: None Disclosure: Not Held