I would love to continue this discussion but unfortunately I am off interstate and wont be back till Monday, at which time if you have your assays back GPP should be soaring, the drill guys will be back pumping out lithium and the assays will be of high grade, good luck if that happens, personally I dont see it, out of 7 holes totalling over 1000 metres of drilling they came across 32 metres in total of possible lithium bearing zone, I do have concerns with that and the fact the drillers needed a ten day break after 7 holes, OHD has been put to bed until at least mid 2019 and they have engaged more consultants, once again good luck and have a great weekend, see you Monday, GLTAH
Expand