The only sticking point there, is that neither the mine or the processing plant have yet been built.
Slowly but surely, TNG are getting the approvals necessary to commence these projects. By the time they do, I am sure John Davison will have designed a project ready for either the mine or the processing plant (or both).
Disclaimer: I hold CCE and TNG.
- Forums
- ASX - By Stock
- Ann: Newcastle Summerhill Solar Farm
The only sticking point there, is that neither the mine or the...
-
- There are more pages in this discussion • 100 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist