Are there any mining aprovals in place.
Time frame on pre stripping.
Contracts to supply or or is it just a heap of dirt requiring a ship load of capital to get moving.
ADY had ore shipments leaving Chile and they are flat out turning a dollar. Benification on the ore was also required to make it a saleable product.
I do hope this has some legs or is part of a bigger picture.
G.T