Re DHEM and vms, read this from a very recent TLM ann:
The effectiveness of DHEM is dependent on many factors. Estimated off-hole coverage is influenced by the size and nature of mineralisation and the continuity of any potential conductive body of mineralisation. Talisman believes the DHEM undertaken to date on the Springfield tenements to be a useful tool for searching for large orebodies within a 100 to 200 metres radius of a surveyed drill hole, but has reduced effectiveness and coverage for smaller, fractured mineralised orebodies.
Put the DHEM idea aside for the time being. Read the AUR ann. Comprehend what TLM has said.
I repeat, it is not a panacaea.
- Forums
- ASX - By Stock
- AUR
- Ann: New High-Grade Copper Intersection At Wodger Prospect
Ann: New High-Grade Copper Intersection At Wodger Prospect, page-80
-
-
- There are more pages in this discussion • 109 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.383M |
Open | High | Low | Value | Volume |
0.7¢ | 0.7¢ | 0.7¢ | $9 | 1.324K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 300000 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 664068 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 103729 | 0.030 |
1 | 218636 | 0.028 |
1 | 300000 | 0.024 |
2 | 200000 | 0.022 |
1 | 100000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 20000 | 1 |
0.034 | 194955 | 1 |
0.035 | 665000 | 1 |
0.036 | 58747 | 1 |
0.039 | 82835 | 1 |
Last trade - 11.47am 15/11/2024 (20 minute delay) ? |
AUR (ASX) Chart |